Winning Parks on Queens Quay

by YQNA

Waterfront Toronto recently announced the winning designs for two Queens Quay West parks to be built at York Street and Rees Street. Design competitions for the parks were held during the summer, with the public voting for five finalists for each park. YQNA took part in a Stakeholder Advisory Committee (SAC), and co-chair Angelo Bertolas met with the final jury.

 

Love Park

(replacing the circular off-ramp from the Gardiner)

Love Park, looking south from Harbour Street. (Image by Claude Cormier + Associés)

The winning design at York Street is Love Park, named and designed by Claude Cormier + Associés of Montreal. It features a heart-shaped reflecting pond with a small island for the large maple tree that will be preserved. The pond is shallow and drainable for events such as markets, or it could be a skating rink in the winter. On the southeast side is a sheltering pavilion with open arches and a coffee stand, washrooms and plenty of seating. Many benches will be placed throughout the park, and dogs will have a special space in the northeast corner.

Love Park was the preferred design of the SAC, because it eliminated the concrete bents (pillars from the old off-ramp). It uses the two-acre site well and has open sightlines, which encourages pedestrian flow and connects the city to the Waterfront. The stainless-steel pavilion with reflecting surfaces could become an iconic feature, just as Cormier’s pink umbrellas made his Sugar Beach design famous and his dog fountain at Berczy Park on Front Street a landmark.

Construction of Love Park, with a budget of $7 million, is scheduled to start in 2019.

 

Rees Ridge

Rees Ridge will help to hide the Gardiner Expressway from the south. (Image by wHY and Brook Mcllroy)

The winning design for the park at Rees Street is Rees Ridge, designed by wHY Architecture of New York and Los Angeles and Brook Mcllroy of Toronto. The design was inspired by the Scarborough Bluffs. It features slopes, ramps, stairs, slides, swings and hills, and an observation deck with views of both the lake and the city. A waterfall is featured next to the cafe, which also provides a community room and washrooms. The significant elevation of the park will hide the Gardiner Expressway and Lakeshore Boulevard when viewed from the Lake. This design also offers summertime tiered seating for events, as well as potential winter toboggan runs.

The SAC found this design the most adventurous and grand. It will undoubtedly draw people to new and exciting views of the downtown and the Waterfront from the observatory atop the pavilion. It is a priority that the observatory be accessible to everybody, and that the pedestrian tunnels to Lake Shore Boulevard are safe, as they exit directly onto the Martin Goodman Bike Trail.

Rees Ridge is the first Toronto project by wHY, while Brook McIlroy has been designing landscaped environments for years across Canada and is currently working on Regent Park. Construction of Rees Ridge, with a budget of $10 million, is targeted to start in 2020.

You may also like

Leave a Comment